Top Floors of 53 Bridge Street Coming Down
March 3rd, 2010
After 5+ years, the top addition of 53 Bridge Street is being taken down, according to a Brownstoner post today. The approved DOB application states, “FILING HEREWITH PARTIAL DEMOLITION OF 8 FLOOR AND ENTIRE FLOOR 9 THRU 13.” Several complaints about falling debris or hanging scaffolding have been submitted over the years. The building is owned by Mr. Guttman. We don’t know the fate of this building, but perhaps work can be done within zoning compliance.
Previously:
{53 Bridge Street Building, 11Sept2007}
{Img: 53 Bridge Street, 13Sept2006}
- Beacon Tower Urban Garden Update III (6Sept07)
- Belgian Blocks Being Replaced on Water Street
- Beacon Tower Garden Update II (2/16/07)
- Washington Street Construction (Oct Update)
- Washington Street Prepped for Belgian Blocks
- Pile Driving on Washington Street
- Construction Update in Dumbo (Mar 2011)
- Washington Street Sidewalk Repair
- Washington Street Construction (Sept Update)
- Dumbo Buildings Hit Puberty in 2006


Leave a Reply